Erection of steel structures for a system of four railway viaducts in Algeria.

Bridges construction in place: FPT jacks and pumps.

PLACE: Algeria


Area: Infrastructure


FPT has been involved in the project to build four railway viaducts for the line Algiers-OA3 El Harrach in Algeria, the material was used for the assembly of steel structures and activities on the various bridge structures. The total weight is 1600 tons.

FPT for the lifting of the metal structures has produced:

– More than 20 jacks model FPT CRIC150/200 with a capacity of 200 ton at 700 bar and a stoke of 200 mm, connected via high-pressure pipes and operated by 2 special pumps with 8 high flow outputs for the synchronous management of the different cylinders.

– The FPT equipment is commonly used for large assembly of steel structures and systems, in various types of metal structures, bridges and road and railway viaducts.

Related projects

Engineering precision for the most demanding challenges

Heavy transport solutions: hollow hydraulic cylinders custom made

PLACE: USA


Area: Transportation


Heavy transport is far more than simply moving equipment from one location to another. It is a complex logistical challenge that requires advanced engineering, precise control, and absolute reliabilit...

Synchronous lifting system FPT

Precision lifting over the Saigon River: a landmark synchronous operation in Vietnam

PLACE: Vietnam


Area: Infrastructure


An impressive and highly complex lifting operation was successfully carried out over the Sông Sài Gòn (Saigon River) in the heart of Ho Chi Minh City, Vietnam, using the advanced FPT – Fluid Powe...

For hydraulic tightening on pipelines

Atex hydraulic pump and related torque wrenches

PLACE: Italy


Area: Oil & gas


The major Italian energy company commissioned the replacement of valves on a natural gas pipeline and used ATEX hydraulic pump and torque wrenches from FPT – Fluid Power Technology for the tightening....